A gymnasium asks a partition to span a wide, tall opening and then be operated every day by staff who are not partition specialists. The mechanism has to be simple to use and tolerant of heavy daily cycles.
The specification problem
The roof is usually a steel truss or long-span structure. That is good news for a top-hung wall, but the hanger positions and the load path have to be designed with the roof engineer, not guessed from a catalogue.
Ball impact, floor markings and the need to keep the playing area clear all affect the panel face and where the stack can sit. A wall that parks into the court is a wall that will not be used.
What to specify
The items below are the ones that decide whether the wall works. Fix them before the shop drawing is issued.
Clear height and width
Finished height to the underside of the structure, and the full clear width of the opening. Tall openings are engineered systems, not a standard-height wall scaled up.
Roof structure
Truss or beam positions, available hanger points and the load each point can take. Twin-point suspension and a steel track are used for tall panels.
Panel face
Specify a face that can take daily contact. The finish cards under Downloads show the available surfaces; the final choice is a durability decision as much as a visual one.
Parking and circulation
Keep the stack clear of the playing area and of the escape route. Draw the parking pocket on the same plan as the court markings.
Operation by staff
Short, repeatable operating sequence. Manual operation is standard on NW831 and NW840; semi-automatic and fully automatic seal operation is available on NW840-W only.
Configuration & model selection
Tall openings use single panels only, suspended at twin points from a steel track with a double roller. The ultra-high platform is engineered up to 18 000 mm (59 ft); the full scope is on the Tall Openings page.
The stacking geometry is the constraint that most often gets missed: a tall single panel needs a deeper pocket than a standard wall, and the pocket has to be reserved before the ceiling is built.
Data for this room
A room type does not carry performance values. Cells marked — are established from the project, not guessed here.
| Item | Value | How it is established |
|---|---|---|
| Clear opening width | — | Measured at finished floor and at track level. |
| Clear height | — | To underside of the supporting structure. |
| Suspension | Twin-point / double roller | As published for the tall-openings platform. |
| Panel configuration | Single panel only | Tall openings lock the single-panel configuration. |
| Maximum engineered height | 18 000 mm (59 ft) | Published platform limit; project-specific design required. |
| Acoustic target | — | State the project target and the test standard. |
Downloads & references
Real documents, one link per file. Ask us for the project-specific shop drawing set for your opening.
Tall Openings Hardware
Steel track, twin-point suspension and double roller hardware.
Double Point Roller Stacking
Twin-point suspension and stacking geometry for tall panels.
Single Point Roller Stacking
Single-point suspension and stacking geometry.
Maintenance Manual
Routine inspection, seal adjustment and track cleaning.
Frequently asked questions
▸Why are tall openings single panel only?
▸What is different about the track for a gym?
▸Can the panel face take ball impact?
▸Who should install a tall wall?
Need a shop drawing for your opening?
Send the opening dimensions, the finished ceiling build-up and your subdivision plan. We will confirm the panel schedule, hanger points and stacking geometry, and tell you which model we would quote.