FAQ
Frequently asked questions
The questions specifiers, contractors and owners ask before they commit to an operable partition — answered from the verified technical data, with the page to read next wherever the detail lives. Comparison questions set the systems side by side; how-to guides walk through selection, installation, operation and maintenance. If your question is not here, send it with the opening size: the answer is usually on a shop drawing.

Request a Quote
Send the opening size, the acoustic requirement and the finish you are looking at. We reply within one working day with the model that fits.
Downloads
The catalogue, the installation manual, the specification sheets and the finish colour cards.
STC Acoustic Guide
How STC and Rw are measured, what the numbers mean in a finished room, and how to write the requirement into a specification.
Choosing a system
Three models, two configurations and four product pages. What actually decides the choice is the acoustic target, the height and the budget - in that order.
Which of the three models should I specify?+−
The three are set side by side, with a selection guide, on the Operable Partitions index page.
Single panel or paired hinged?+−
All three models are supplied in either configuration, so this is a project decision rather than a model constraint. The paired system is specified on its own page: Paired Hinged & Folding.
Can the run turn a corner, or curve?+−
Can I mix single and paired panels in one run?+−
Which system suits a tall opening?+−
How many panels will I need, and is there a maximum run length?+−
Acoustics & compliance
How the published numbers were measured, what they mean once the wall is installed, and what to write into the specification.
What is the difference between STC and Rw?+−
What STC rating do the partitions achieve?+−
How do I write the acoustic requirement into a specification?+−
What fire classifications do the panels carry?+−
Are the walls rated for US projects?+−
Operation & automation
How the seals are set, what can be automated, and what automation costs the panel.
How are the seals operated?+−
NW831 and NW840 are manual only - there is no semi-automatic or fully automatic option on either. NW840-W takes a manual handle as standard and can also be supplied with semi-automatic or fully automatic seals; that system is on the Motorized page.
What is the difference between semi-automatic and fully automatic?+−
Which of the three suits a project depends on the run length, the panel height and who operates the room. The actuation detail is fixed on the technical submittal.
Can a manual NW840-W be upgraded to semi-automatic later?+−
Which mechanism operates the seals?+−
The Jack-type Mechanism is a NW840-W option only. A screw jack on the steel braced frame inside the panel sets the seal bars against a fine thread, so the seal goes to a repeatable position rather than being set by feel. It needs the steel frame to carry it, which is why it is not offered on the aluminium-framed NW831 and NW840 - and that is a frame difference, not a preference.
Does the wall touch the floor, or need a floor channel?+−
Sizes, weights & site conditions
What the system needs from the room, and what the room gets back.
What panel sizes are available?+−
How much do the panels weigh?+−
What does the structure above have to provide?+−
How much stacking space does the run need?+−
Does the run need a pocket or a recess?+−
Finishes & options
What the panels can be faced with, and which options are model-dependent.
What finishes are available?+−
Can I get a colour card or a physical sample?+−
Which models can have a trimless edge?+−
Can a pass door be fitted?+−
Can the panels take a whiteboard or a vision panel?+−
Ordering, delivery & warranty
What happens after the enquiry lands, and what is guaranteed once the wall is in.
How do I request a quote, and what do you need?+−
How long does delivery take?+−
What is the warranty?+−
What are the commercial and shipping terms?+−
Who installs the wall?+−
System comparisons
Ten head-to-head questions for when the choice is between categories, not just between catalogues.
Operable partition vs operable glass wall – what is the difference?+−
Solid panels win on acoustic headroom and finish choice; glass wins on daylight and the visual connection between spaces. Compare the two lines on Operable Partitions and Operable Glass Walls.
Operable glass walls vs demountable glass partitions+−
If the layout is permanent, a demountable system is the simpler answer. If the room divides and reunites daily, that is what the operable system is built for.
Operable partitions vs fixed partition walls+−
The trade is capital cost and a small loss of raw acoustic performance against flexibility. Where the room is reconfigured weekly, the operable wall pays for itself in usable area; where it never changes, fixed construction is the rational choice.
Operable partition vs room divider (residential lightweight divider)+−
They are not competing products: a divider separates a living room occasionally; an operable partition divides a commercial room every day.
Acoustic operable partition vs non-acoustic operable partition+−
If you need a visual-only divider for a low-sensitivity space, tell us the use and we will say honestly whether a rated build is required.
Manual operable partition vs motorized operable partition+−
On the partitions, NW831 and NW840 are manual only; NW840-W takes manual as standard and semi- or fully automatic as an option. On the glass walls, NG80 is manual and NG80-M is fully motorized. Motorized earns its cost on wide, tall or heavily used runs — see Motorized.
Top-hung operable partition vs floor-supported movable partition+−
Floor-supported systems put the load into the floor through a track or channel. That suits very heavy panels or a ceiling that cannot take the load, at the cost of a floor channel and a fixed datum. Every NEUWALL partition and glass wall is top hung; if the structure above is the constraint, tell us at enquiry and we will review it before quoting.
Operable glass wall vs sliding glass wall+−
If you need the entire opening open, that is the operable system. A slider is the right answer only where half the opening is enough.
Operable partition vs accordion folding partition+−
Accordion suits occasional, light-duty division. Where the wall is used every day and the acoustic target is specified, the operable partition is the engineering answer.
Operable partition vs operable curtain wall+−
If what you need is a movable glazed divider for an interior space, that is the operable glass wall; for an exterior façade, that is a curtain-wall contractor's scope.
Performance & metrics compared
What the published data can and cannot tell you — acoustics, cost, maintenance, lead time and fire classification, side by side.
What STC rating should I choose for operable partitions?+−
Specify the target and the room use and we will confirm which model meets it and what the head and perimeter details have to do — the installed wall is only as good as the structure it sits in. The STC Acoustic Guide explains how to read the numbers.
STC operable partition vs STC operable glass wall+−
Treat the numbers as two separate test results, not one scale — ask for the laboratory report behind either figure before specifying. Solid panels have the headroom for the highest targets; glass holds a moderate rating with full transparency.
How does sound insulation compare between solid operable panels and glass operable walls?+−
In both cases the installed result depends on the surrounding structure, the head detail and the perimeter sealing, so specify against the test report and check the flanking paths.
Cost comparison: operable solid partitions vs operable glass walls+−
Both lines are quoted per project with shop drawings for your opening. Send the width, height, acoustic target and finish and we will come back with a priced proposal for the system that fits — that is the only cost comparison worth having.
Maintenance cost: operable glass wall vs panel operable partition+−
Glass adds glass care (cleaning, and suction-cup handling at installation); solid panels add finish care. Actual service cost depends on how many cycles a day the wall sees — tell us the duty and we will send the maintenance schedule with the quotation.
Lead time comparison: custom operable partitions vs standard operable glass walls+−
We confirm the schedule with every quotation rather than publish a figure that would be out of date — send the opening size and the project programme and we will tell you where it lands.
Fire-rated operable partition vs standard operable partition+−
BS 476 is not the same test as ASTM E84 / UL 723, and a result in one is not a result in the other — check which classification your project and the local authority accepts, and ask us for the report behind the figure you specify.
What are the pros and cons of operable glass walls for conference rooms?+−
Against: the rating ceiling sits below the top solid builds, so a noisy adjacency may call for a solid wall instead; glass needs cleaning and careful handling; and privacy for calls is a separate consideration from the wall itself.
Most offices land on glass for meeting rooms that need light and solid for the rooms that need quiet — we will propose both if the floor plate allows.
What are pros and cons of solid operable partitions for hotels and banquet halls?+−
Against: no daylight transfer through the panel; the heavier builds (up to 52 kg/m²) put more load into the structure above; and the stacking depth is larger than a glass run.
For a banquet room the acoustic range usually decides it — send us the brief and the opening and we will propose per room.
Choosing by room
The same two product lines answer differently depending on the room. Four scenarios, four recommendations.
Which is better for hotel banquet rooms: operable solid partitions or glass operable walls?+−
Glass earns its place where the room needs daylight or a visual link — a pre-function space, a foyer, a divider that stays open for a plenary session. The usual answer is solid for the divisible banquet hall and glass where the room opens to a circulation spine. Send both room briefs and we will propose per room.
Which works better for office conference rooms: operable glass walls or solid operable partitions?+−
Most office floors use both: glass on the open side of the plate, solid around the boardroom. Tell us the adjacency and the room use and we will split the floor with you.
Operable glass wall vs operable partition for school classroom separation+−
Both hang from the track with no floor fixings, so either survives a corridor-heavy school day. The choice is the acoustic target against the supervision need — send the room schedule and we will cost both.
For restaurant private dining rooms: operable glass or solid movable partition?+−
Solid gives full privacy and a quieter room, and takes the design finishes — veneer, leather, upholstery — that a dining room is dressed in. If the priority is privacy and quiet, go solid; if the room should feel open between services, go glass. Both are quoted with the same top-hung, no-floor-track installation.
How to choose & specify
The eight questions contractors and specifiers ask before the drawing is issued.
How to select operable partitions for a banquet hall?+−
Send those six and we will confirm the model, the panel count and the stacking arrangement on the shop drawing.
How to choose operable glass walls for office conference rooms?+−
Check two things on site: the ceiling structure can carry the track load for the glass weight, and the floor is level — the glass wall needs a level floor for panel alignment and seal contact. The published rating is Rw 44 dB (ISO 717-1).
How to calculate the panel size for operable partitions?+−
The panel count, the stack and the pass-door position are fixed on the shop drawing for your opening, because a pass door changes the stacking length — send the dimensions and we will do the arithmetic against the room.
How to choose STC rating for operable partitions for offices?+−
Specify the target and the room use, and check the flanking paths as well as the panel — the wall is only as good as the structure it sits in. We will confirm the model and the head and perimeter details on the shop drawing.
How to specify operable partitions in architectural drawings?+−
Send the plans at enquiry stage and we will return the shop drawing — the run, the stack, the track and the head detail — before anything is fabricated.
How to select motorized operable glass walls?+−
Provision needed at the ceiling track: power and the control point, plus structural support for the glass weight. If the run is repositioned several times a day, motorized is the version to specify.
How to choose fire rated operable partitions?+−
Pick the face-and-core combination that carries the classification you need, and ask us for the laboratory report — we will send it with the test laboratory's reference so your submission stands on the report, not on a claim.
How to decide between top-hung vs floor track operable partitions?+−
If the ceiling cannot take the load, tell us at enquiry: we review the structure before quoting rather than discover it on site. Floor-track systems exist in the market for that constraint, but they bring a floor channel with them — that is the trade.
How to install: structure & track
What the ceiling has to provide, how the track goes in, and how the run meets the obstructions on site.
How are operable partitions installed?+−
The finished floor line is the datum throughout, and the head detail, fixity and track height are set from it on site. If you need installation support for your location, tell us at enquiry stage and we will confirm what we can cover.
How to install top-hung operable partition tracks?+−
Anything above the track — false ceiling, plenum closure, sound baffle — is also by others. Set the track from the finished floor line, not from the slab, and the panels will hang true.
How to install operable glass walls?+−
Two site conditions decide whether it goes in cleanly: the floor must be level for panel alignment and seal contact, and the overhead track must have structural support for the glass panel weight. The installation manual ships with every system.
What ceiling structure is required for top-hung operable partitions?+−
We state the load and the fixity on the shop drawing; the structural adequacy of the supporting element is confirmed by the project's engineer. If the ceiling is the open question on your project, send the construction and we will review it before quoting.
How to handle uneven floors for operable partition systems?+−
Glass walls are the exception — the floor must be level for panel alignment and seal contact. Where the floor is out, level it before the glass wall is installed rather than shimming afterwards.
How to install the sealing gaskets on operable partitions?+−
The mechanism behind the lever is the Push-to-Extend Spring on all three models, with the jack-type mechanism as a NW840-W option. Neither is a field-assembled or field-adjusted item — if a seal is not holding, that is a service call, not a site fix.
How to fit operable partitions around columns and beams?+−
Feasibility is settled on the shop drawing against the column or beam position and the stacking space, so send the obstruction positions with the opening dimensions rather than trying to solve it on the plan.
How to operate, maintain & repair
The questions that come after handover — operation, routine maintenance, and what to do when something sticks.
How to operate operable partitions correctly?+−
Never drag a panel with the seals extended: the seals are meant to touch the track and the floor only when they are set. The full sequence is in the operation manual that ships with every system.
How to operate motorized operable glass walls safely?+−
Glass panels are handled as glass — no leaning, no stacking loose items against them — and the motorized run should be demonstrated at handover so the operator sees the full cycle before the room goes into service.
How to fix an operable partition that is hard to slide?+−
If it still drags, stop and call it in — forcing a panel loads the trolleys and the track. Send us the panel position and we will tell you whether it is a site fix or a service visit.
How to adjust the sealing gaskets on movable operable walls?+−
If a seal is not holding or the panel rocks when set, report it — we will tell you what to check on site and what needs a technician.
How to maintain operable partitions long term?+−
Seal and hardware service life depends on how many cycles a day the wall sees; ask for the maintenance schedule with your quotation. The track and trolleys carry a five-year warranty, the panels two.
How to clean operable glass partition panels?+−
Laminated panels (made to order) clean the same way as the standard 8 mm + 8 mm double-glazed build. There is no special coating to preserve — but there is a painted border to protect.
How to replace rollers / trolley wheels for operable partitions?+−
Do not attempt it from a ladder with the panel hanging on one trolley — send us the panel number and position and we will arrange parts and the service visit.
How to fix alignment issues on operable glass walls?+−
Carrier and busbar adjustment is service work; do not shim or re-hang the track in the field. Report the panel and the symptom and we will tell you what to check and what needs a technician.
How to inspect operable partitions for safety annually?+−
Anything loose, cracked or not latching means take the panel out of service until it is fixed. Keep the record — it is the document that shows the wall has been maintained if a claim ever arises.
How to quote, plan & comply
The commercial and code questions around the order — what to send, what to draw, and what the authority will ask.
How to get a quotation for custom operable partitions?+−
We reply within one working day with the model that fits, the price band and what we need to draw it. Every quotation is accompanied by shop drawings for your specific opening.
How to prepare drawings for operable partition manufacturer?+−
Mark the datum and the tolerances, and include the column and beam positions if the run meets an obstruction. From those we issue the shop drawing — the run, the stack, the track and the head detail — before fabrication.
How to meet local building code requirements for operable glass walls?+−
Send us the code section and we will confirm what our reports cover and flag anything that needs local testing or a consultant's letter.
How to add operable partitions to a renovation project schedule?+−
The two dates that move are the shop drawing approval and the production slot — both confirmed with the quotation. Give us the programme date you are working to and we will tell you whether it is achievable for your opening and finish.
How to test sound insulation of operable partitions after installation?+−
Ask us for the laboratory reports to specify from, and involve the consultant early — the field result depends on the surrounding structure and the perimeter sealing as much as on the panel.
Quick answers before you decide
Seven short answers to the questions people ask before they pick up the phone.
Are operable glass walls soundproof?+−
If the target is higher than that, the solid partitions publish up to STC 55 dB on NW840-W — and the two scales are never converted, so compare against the test reports, not against each other.
How long do operable partitions last?+−
We do not publish a lifetime figure because duty cycle decides it — tell us how the room is used and we will send the maintenance schedule so the expectation is written down from the start.
Can operable partitions be customized in size and finish?+−
Vertical profiles are anodised aluminium as standard with powder coating available. Everything is confirmed on the shop drawing for your opening.
Are operable partitions reusable if the tenant moves out?+−
Reuse in a new opening depends on the new opening matching the panel sizes; where it does not, panels are re-fabricated to the new dimensions. For leased space that is a real difference against fixed construction — tell us if relocation is part of the brief.
Do operable glass walls require building permits?+−
What we supply for the submission: the Rw 44 dB test report (G21024AC226048), the glass make-up, the system depth and the track load — the technical data the application needs.
What finishes are available for operable partition panels?+−
Colour cards for the wood veneer and vinyl ranges are on the Downloads page; colour may vary slightly between production batches, so confirm against the physical sample before ordering.
Can operable partitions be curved?+−
If your layout is curved, send the plan and the radii and we will review what is feasible rather than guess from a catalogue.
On the figures.
Acoustic performance is published as STC (ASTM E90 / E413) for the operable partitions and as Rw (ISO 717-1) for the operable glass walls; the two scales are never converted into one another. Fire classifications are per face-and-core combination — BS 476 Part 7 Class 1, EN 13501-1 B-s1, d0 and ASTM E84 Class A are different tests and are not interchangeable. Ask us for the laboratory report behind any figure you intend to specify.
Question not answered here?
Send it to us with the opening size. Most answers live on a shop drawing, and we reply within one working day with the model we would quote.
