FAQ1 views

What is the typical installation process?

A qualified team installs the head track to the structure, hangs panels, and sets seals. Because walls are top-hung with no floor track, finished-floor work is unaffected. On-site installation time depends on panel count and height.

A qualified team installs the head track to the structure, hangs panels, and sets seals. Because walls are top-hung with no floor track, finished-floor work is unaffected. On-site installation time depends on panel count and height.

Interested in a Similar Solution?

Contact us to discuss how our acoustic partition systems can transform your space.